Accept Phase 5 plan, add phase-loop skill

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_019dpKwZWtahQU4V2NhpVmLt
This commit is contained in:
ariandClaude Sonnet 5.5 committed 2026-10-19 17:36:54 -04:00
1 parent 782e5dc440
commit d04d99a9a6
5 files changed
+145 -14

No files matched your search

+19 -1
View File
@@ -6,7 +6,7 @@ _Last updated: 2026-10-19_
## Status
The build is functionally complete and merged to `main`. REST, MCP, OTel, TLS and the NixOS module are implemented. Verification #1–#4 and #6 passed live on minipc1 (2026-10-19). The WS-H nix gate passed on 2026-10-19. Nothing is in flight; everything open is in the Backlog.
The build is functionally complete and merged to `main`. REST, MCP, OTel, TLS and the NixOS module are implemented. Verification #1–#4 and #6 passed live on minipc1 (2026-10-19). The WS-H nix gate passed on 2026-10-19. Phase 5 (consolidator) is planned and starting; everything else open is in the Backlog.
| Milestone | Gate | Status |
|---|---|---|
@@ -17,6 +17,24 @@ The build is functionally complete and merged to `main`. REST, MCP, OTel, TLS an
| M4 NixOS | `nix flake check` passes including the VM test. `:1984` serves and a token is minted with the system-installed CLI. | ✅ 2026-10-19: `nix build` and `nix flake check` (incl. VM test, plain + TLS) pass; see [WS-H log](docs/workstreams/WS-H-nixos.md#log) |
| M5 TLS | HTTPS serves REST and `/mcp`, SIGHUP reloads certs, no openssl. | Done |
## Phase 5: Consolidator (in progress)
Plan: [`plan/phase-5-consolidator/`](plan/phase-5-consolidator/README.md). Decisions accepted 2026-10-19 (DEC-13, DEC-14). Work loop: `.claude/skills/phase-loop`. Task text lives in each `ws-*.md`; tick here only.
| Milestone | Gate | Status |
|---|---|---|
| M6 Consolidator | Phase 5 exit criteria; peer-less instance unchanged (8 MCP tools); `nix flake check` incl. the peers VM test | Not started |
- [ ] **WS-T** tests: T1 T2 T3 T4 T5 T6 (peers.nix written) · [ ] T7 `dev/test.nu` runner
- [x] T1..T6 written in `nix/tests/peers.nix`; promoted to `checks` by F2
- [ ] **WS-A** config: [ ] A0 stubs · [ ] A1 config · [ ] A2 validation · [ ] A3 secrets loader · [ ] A4 `peer` CLI
- [ ] **WS-B** registry: [ ] B1 client · [ ] B2 health loops · [ ] B3 status model · [ ] B4 SIGHUP reload · [ ] B5 transport + SSRF guard
- [ ] **WS-C** REST: [ ] C1 status routes · [ ] C2 pass-through · [ ] C3 `x-slinuxm-peer` header · [ ] C4 error mapping
- [ ] **WS-D** MCP: [ ] D1 `peer` arg · [ ] D2 `list_peers`/`get_peer` · [ ] D3 instructions
- [ ] **WS-E** telemetry: [ ] E1 gauges · [ ] E2 client spans and propagation
- [ ] **WS-F** NixOS and docs: [ ] F1 module · [ ] F2 promote VM test · [ ] F3 `tests/peers.rs` · [ ] F4 README, `docs/consolidator.md`
- [ ] **Final review** and fold-in: move `plan/phase-5-consolidator` to `docs/workstreams/`, collapse into the Completed table, add Backlog entries (D8 fleet aggregation, scoped tokens, health history, runtime peer management)
## In progress / Review
| Item | Owner | State |